Pictured are two of the four Hotwell Pump Suction
Strainers we fabricated for the Cliffside Steam Station located on
the Rutherford/Cleveland County line in North Carolina. Once
online, the 825-megawatt advanced clean-coal unit will allow Duke
Energy to retire Units 1 to 4 and help make Unit 6 carbon neutral
by 2018. Sure Flow Equipment Inc. is proud to be involved in
providing filtration to Duke Energy. On March 13, 2009, Duke Energy
received a final revised air permit for the new, state-of-the-art
Cliffside Unit 6 from the North Carolina Department of Environment
and Natural Resources, Division of Air Quality. The permit
designates that the unit is a minor source of hazardous air
pollutants. Remember to contact Sure Flow Equipment for all your
custom engineered, fabricated strainers, filters and valves. For a
full overview of our product line and technical scope we invite you
to check us out at: www.sureflowequipment.com